Manufacturing

Meet Kos, the last finance hire your next production line needs.

For manufacturers scaling their own production: batteries, robotics, space, EVs and chips. Every machine you order becomes a deposit, an acceptance payment and a delivery to reconcile.

Kos reads all 812 pages of Ridge Electric’s pay app #14, ties out the distribution and generator lines, and flags switchgear billed ahead of the work, Hollis Supply’s missing lien waiver and retainage held at 2.5% where the contract keeps 5%. It recommends $754,300 of the $1,374,750 requested, drafted in NetSuite for your approval.

Procure-to-pay: Calder Power emails a milestone invoice to the AP inbox. Kos enters it as a bill in your ERP, matches it to PO-4512 and the signed factory test report, codes it, flags $4,860 of freight that isn’t on the PO, and saves the bill at $486,000, pending your approval.

Maya invites Kos to a video call and walks it through a bill on screen share, Kos asks who to tell when a bill doesn’t match the PO, then replays the workflow on a new bill in the ERP sandbox while she watches: it finds the prepayment already went out, tells the requester on Teams, and leaves the bill pending your approval.

Customers and investors

  • Working with
  • Backed by

The Problem

Every machine is a deposit, a milestone and a delivery. None of them match.

Three problems manufacturing finance teams describe, and who feels each one most.

  • Three-way match breaks on real life

    A deposit at order, a payment at factory acceptance, the balance at install, then a partial shipment and freight split across lines. Nothing matches.

    Felt most by the controller

  • You’re getting fleeced

    Vendors bill the next milestone before the machine passes acceptance, escalations and expedite fees creep in, and a deposit gets invoiced twice.

    Felt most by procurement

  • You can’t hire your way out

    Bill volume grows with every new line, and experienced AP and procurement staff take months to find.

    Felt most by the CFO

What Finance Teams Tell Us

A lot of the things that are forcing us to have more touches in the system for three way match do require some level of judgment.

Accounting lead at a defense manufacturer

Nobody in their right mind has the time to review it. So they’re getting scammed and things are getting missed.

CFO at a hyperscale data center developer

It’s too hard to throw bodies at. And you have the attrition and people moving into different roles. And something’s almost getting dropped.

Former CFO at a public data center company

I’ve gone from being able to handle my job to sort of rubber stamping, because there’s just no way in hell I can actually do it accurately.

Former CFO at an AI cloud company

The Solution

Kos ties every payment to what was agreed.

The answer to each problem above: every invoice matched to its PO, every milestone checked against acceptance, and the next line covered without a new hire.

  1. Procure-to-pay

    Your three-way match holds. Kos tracks every deposit, milestone and final payment against the quote, PO and acceptance, and works the everyday vendor bills too.

    Learn more: Procure-to-pay
  2. Billing review

    Nobody bills ahead of the work. When you build or fit out a plant, Kos checks the contractor’s pay apps against the contract and schedule of values the same day.

    Learn more: Billing review
  3. Teach Kos

    No hire for the next line. Show Kos your month-end close or capex tracker once on a screenshare, and it runs it that way every time.

    • Month-end close
    • Capex tracking
    • Freight allocation
    Learn more: Teach Kos

How It Works

Forward the milestone invoice. Kos checks every term.

Nothing new for your team or your equipment vendors. The invoice goes to Kos the way it goes to a colleague, and comes back checked the same day.

  1. Forward the milestone invoice

    Email Kos the equipment vendor’s invoice like you would a colleague, or ask it in Slack, Teams, iMessage or on a call.

  2. Kos reads it against the PO

    The quote, the PO’s payment terms, the factory acceptance report and every payment already made on the machine.

  3. Kos flags what doesn’t tie out

    A milestone billed before acceptance, a deposit billed twice or terms that don’t match the PO, each with the page behind it.

  4. Drafted for your approval

    The bill coded to the line and the machine, your capex tracker updated, and the entry drafted in your ERP. Nothing posts until you approve.

Long-Lead Equipment

Every machine, matched milestone by milestone.

Furnaces, machining centers and whole production lines are ordered months ahead and billed in milestones. Kos matches each milestone invoice to the PO terms and the payments already made, checks the acceptance report for anything billed before delivery, and holds what the quote doesn’t cover.

  • Deposit
  • Factory acceptance
  • Delivery
  • Site acceptance

What It Catches

What Kos holds before you pay.

Each hold comes back with the reason and the evidence. Approval and payment stay with your team.

  • Duplicate bills

    The same bill sent twice, or re-sent under a new number. Held, with the original linked.

    Duplicates

  • Bills past the PO

    Over the remaining balance, priced above the quote, or charged to a closed PO. Held, with the reason.

    PO balance

  • Wrong entity

    Bills coded to the wrong plant’s entity instead of the one that owns the PO.

    Entity

  • Missing receipts

    Held where the PO requires a three-way match and the shipment hasn’t been received.

    Receipt

  • Sales tax

    Tax charged on exempt machinery, or missing where it should be.

    Sales tax

  • Milestones billed early

    A machine billed before factory acceptance, or a deposit invoiced twice.

    Milestones

In Your ERP

Forward the bill. Kos works it in your ERP.

Kos works inside your ERP with its own login, like a new hire, whether that’s NetSuite or another system. Nothing to install, and nothing posts until your team approves it.

  1. The bill lands in the AP inbox

    Corliss Alloys emails INV-8842 for 24 aluminum plates to the AP inbox, where Kos has its own address. Or forward it to Kos as you would to a colleague.

  2. Kos matches the PO and receipt

    Kos opens PO-2245 in your ERP and finds the receipt: 18 of the 24 plates came in on Oct 30, and the last six ship Nov 12.

  3. Kos codes it and flags the rest

    Mesa Line 2, raw materials, account 1310. The six plates not yet received aren’t on the receipt, so Kos flags them and recommends $41,400.

  4. Drafted for your approval

    The bill waits as pending approval with the flag noted. Nothing posts until someone on your team approves it.

Not New Software

Kos exists where your team already works.

Kos has its own email address and accounts, like anyone you hire. Forward it a milestone invoice, ask it about a PO in Slack, text it about the close or bring it into a call. Nothing to install.

Invite Kos to a Zoom, Google Meet or Teams call and share your screen. Show it how you track a machine’s payments once, and it tracks the next one the same way.

Instead Of

More clerks, more trackers, or one hire.

What manufacturing finance teams reach for today, next to a colleague who checks every invoice against the PO.

Kos compared with more AP clerks, outsourced accounting, capex trackers in spreadsheets, and frontier LLMs like Claude and ChatGPT
Compared onMore AP clerksOutsourced firmsCapex trackersFrontier LLMsKos
Time per invoiceDays in the queueTheir month-end cycleWhenever someone updates itHours of prompting and checkingSame day
What gets checkedThe PO totalA sample, at closeWhat someone types inThe pages you uploadEvery term, against the PO
Where the work landsSpreadsheets and emailA month-end reportAnother spreadsheetA chat replyYour Excel, inbox and ERP, once you approve
How you work with itHire, train, retain, per lineEngage, wait, pay by the hourUpdate by hand, every weekBuild, prompt, check every billEmail, Slack, a call
What it takes to startMonths of hiringA statement of workA template to keep currentA custom build on the modelsForward one invoice

Outcome

With Kos on the team, every machine is paid to terms.

Kos reads every quote, PO and milestone invoice, and your team approves what goes out.

  1. Nothing slips through

    Every equipment payment ties to the PO terms and acceptance, so a milestone billed before the factory test or a deposit billed twice is held before the payment run, not found at close.

  2. Same-day reviews, partners paid on time

    Each invoice comes back checked the day it lands, so vendors get paid the day a milestone is met. Your machines keep their place in the build queue, and the parts keep arriving.

  3. Hired, not implemented

    Kos works in your ERP, AP inbox and procurement threads like anyone on your team. Ask it at 11pm how much is left to pay on the furnace order, and it answers with the page behind the number.

You Stay in Control

Kos does the reading. You make the call.

  • A human approves before anything posts.
  • Every flag shows its page and clause, so your team can check any finding.
  • Kos has its own identity, only the access you give it, and a full audit log.
  • Your data stays in your systems.

Who It’s For

Built for the teams behind the line.

For manufacturers scaling their own production, from batteries, robotics and EVs to space hardware, chips and advanced materials.

  • Scaling a new line

    Furnaces, machining centers and tooling, ordered months out and paid in milestones. Kos tracks every machine from deposit to site acceptance.

    For the controller and procurement

  • Running plants across entities

    Every new plant is a new entity, often on a young ERP. Kos codes each vendor bill to the plant and entity that owns the PO.

    For AP and accounting

  • Building a new plant

    Kos checks the contractor’s pay apps against the contract and schedule of values, the same day, before the money goes out.

    For the CFO

Questions, answered.

Kos is deterministic (not generative), governed, verifiable, and scalable for can’t miss, backoffice workflows. It checks every line item, every clause, every time.

Nothing posts until someone on your team approves it. When Kos is unsure about a line, it asks instead of guessing.

No. Kos works on ERPs less than a year old. There’s nothing to implement: Kos gets a login like a new hire, and your team emails it the work.

Kos reads each quote and PO for its own deposits, milestones and terms, and keeps your capex tracker in your columns. Show it your process once on a screenshare.

Kos works inside your systems under its own identity, with only the access you grant, and every action is logged.

No. They keep sending invoices to the same inbox.

A clerk takes months to find and covers one inbox. Kos covers every line and every plant from the day it starts, to the same standard.

Yes. It reads the quote, the PO terms and each milestone invoice, and shows what’s paid and what’s left.

Why Now

The next line won’t wait for your next hire.

Machines cost 42% more than in 2019.

Machinery prices have risen every year since. Each new line arrives as quotes, deposits and escalations your team has to tie back to the PO.

US Bureau of Labor Statistics, Sep 2026 (opens in a new tab)

+42%

machinery prices, September 2026 against 2019

Producer price index, machinery manufacturing (December 2003 = 100), each September, not seasonally adjusted. September 2026 is preliminary.

Inventory on the books is up 41% since 2019.

Up from $431B. Every dollar of it came in on a receipt that had to match a PO and a vendor bill, and it all has to tie out at close.

US Census Bureau, Aug 2026 (opens in a new tab)

$608B

of inventory on durable goods makers’ books, August 2026

Total inventories of US durable goods manufacturers, end of each August, seasonally adjusted, not adjusted for inflation. August 2026 is preliminary.

Aluminum costs almost twice what it did in 2019.

Up 25% in the last year alone. Every surcharge reaches your desk on a vendor bill, and someone has to check it against the price on the PO.

US Bureau of Labor Statistics, Sep 2026 (opens in a new tab)

+91%

aluminum prices, September 2026 against 2019

Producer price index, aluminum mill shapes (1982 = 100), each September, not seasonally adjusted. September 2026 is preliminary.

Truckload freight costs 61% more than in 2019.

Up 18% in a year. Freight is the charge least likely to match the PO, and it’s split across every line it ships with.

US Bureau of Labor Statistics, Sep 2026 (opens in a new tab)

+61%

truckload freight rates, September 2026 against 2019

Producer price index, long-distance truckload general freight trucking (December 2003 = 100), each September, not seasonally adjusted. September 2026 is preliminary.

Add the line, not the clerks.

No new software to learn. Email Kos the work and watch it run.